Architecture and use
Definition and documentation of storage areas, administrative spaces, circulation routes and technical rooms across the ground floor and two partial upper levels.
Lead design and multidisciplinary coordination for a large industrial building used for tyre storage and its associated administrative functions.
The commission began with the building’s existing layout, structure and established internal functions. The design objective was to integrate the architectural measures and building services required for fire safety while preserving the operational logic of the storage facility.
The design was developed from a survey of the existing condition and the building’s operational scenarios. The architectural drawings provided the common coordination base for both passive and active protection measures.
Definition and documentation of storage areas, administrative spaces, circulation routes and technical rooms across the ground floor and two partial upper levels.
Coordination of escape routes, access points, doors with specific performance requirements and compartment boundaries within the existing geometry.
Coordination of detection and alarm, emergency lighting, hydrants, automatic suppression, smoke and heat exhaust, and lightning protection systems.
Alignment of reports, drawings, the technical assessment and specialist documents into a coherent package for the approval stage.




To protect contractual information, the published material consists solely of anonymised technical extracts. The client’s identity, the names of other contributors, contract values and administrative documents are not disclosed.